Wednesday, February 3, 2016

Community Board 7 calls on DOB to stop work until safety issues are satisfied

Many thanks to Community Board 7 and the Youth, Education, & Libraries Committee for researching, drafting, and passing this resolution!
-----------

RESOLUTION

Date: February 2, 2016
Committee of Origin: Youth, Education & Libraries
Re: Protections for PS 75 from Effects of Adjacent Construction
Full Board Vote: 42 In Favor  0 Against  0 Abstentions  0 Present
Committee: 8-0-0-0.

This Resolution is based on the following facts:

A development group is moving forward with a plan to construct a new 10-story residential tower directly above the existing 6-story rent-regulated apartment building at 711 West End Avenue, located on the west side of the avenue between West 94th-95th Streets, in Manhattan Community District 7. 

The new tower is intended to be a separate structure that sits on a platform to be erected above the existing building, although support columns, elevator shafts and other connections from the new tower will pass through portions of the existing building.

The project involves a novel method of construction that the development team nevertheless contends is "as-of-right" for zoning and building code purposes.

Construction of the platform and new tower will require drilling into bedrock to create footings for the multiple support columns for the new platform and tower.  It will also require the use of one or more construction cranes at least as tall as the combined 16-story height of the planned structure, the removal of excavation and other debris and the delivery of steel beams for the support columns and platform, as well as significant amounts of other construction materials and supplies, and the need to devote sidewalk and travel lane space on West 94th and 95th Streets for staging areas.

The project will drastically disrupt the residents of the occupied existing building who will endure the excavation and insertion of the columns inside and outside the existing structure to support the platform; the demolition of existing apartments in whose place new elevator shafts will be built to accommodate separate elevators for the new tower; vibrations from blasting for the column footings and from anchoring the columns to the existing structure; and the noise, dust, debris from a complex and active construction site literally right above their heads for a period of months if not years.

The corridor between West 95th -96th Streets west of Amsterdam Avenue is the scene of significant traffic congestion, with West 95th Street serving as the lone egress route east from the southbound exit of the Henry Hudson Parkway (heavily traveled in the morning rush), and West 96th Street functioning as the sole means of access to the northbound and southbound lanes of the Parkway (heavily traveled throughout the day).  These and neighboring intersections have seen three pedestrian fatalities from vehicle collisions, numerous vehicular collisions resulting in serious injuries, and a constant stream of near-misses.  The Department of Transportation, in consultation with CB7 and our area elected officials, has re-designed West End Avenue's travel and parking lanes in an attempt to address the safety issues presented by this high volume of traffic through a densely populated residential area.

PS 75 (the Emily Dickinson School), an elementary school, and MS 250 (the West Side Collaborative School), a middle school, are situated in the school building on the west side of West End Avenue between West 95th-96th Streets. 

PS 75 is home to a NEST program that offers an integrated teaching approach that reaches students with differing abilities on the autism spectrum as well as students in general education populations, as well as serving other special needs students in a variety of contexts.  Special needs children are particularly vulnerable to external disruptions from noise, vibration, and congestion.  Both schools reflect the racial, ethnic and socio-economic diversity of the larger surrounding community. 

Based on a safety plan carefully developed in consultation with the school principal and community, the NYPD 24 precinct and school safety command, CB7 and others, virtually all staff and students enter on West 95th Street.  According to the Principal at PS75, this is the only viable door for entry and exit based on the mandated need for a security desk at the point of entry.  This entrance will be situated less than 100 feet from the site of drilling, construction, staging and deliveries for the new residential tower. 

In addition, the playground used extensively by the school for dismissal, recess, afterschool and other activities is located across West 95th Street from the construction site, and would be exposed to all manner of dangers incident to such construction.

Students will be as close as 100 feet from the considerable noise and vibrations inevitably generated by this construction, especially since creating footings for the columns will necessitate blasting into bedrock.

In a recent case regarding the adequacy of an environmental impact statement concerning a construction project adjacent to a nearby public school, a New York Court insisted upon heightened protections from noise, toxic substances and related construction effects where the health and safety of school children were impacted. 

Elected officials have engaged the developers over the concerns regarding noise, vibration, dust and debris, traffic and sidewalk congestion.  It should be acknowledged that progress has been made on some issues such as relocating the principal construction crane away from the area closest to the school, and arranging for a sidewalk bridge to cover the West 95th Street access to the school building.  However, both the school and the residents of the existing building still have significant, outstanding concerns.

THEREFORE, Community Board 7/Manhattan calls on:

  • Any final commitments made by the developer should be memorialized and shared with the PS 75 community and the building’s tenants;
  • the NYPD 24 precinct and school safety command and the Department of Education to re-evaluate and re-develop plans for student drop-off and dismissal to account for the dangers presented by the construction at 711 West End Avenue;
  • the DoE and School Construction Authority develop a plan to protect the safety of students and staff utilizing the small yard and playground adjacent to the school on West 95th Street;
  • the FDNY to conduct a new assessment of the fire evacuation plans for the school, and to work with the DoE, SCA, principals and PTA to develop plans that take the externalities of construction into account;
  • the New York City Department of Environmental Protection to conduct an environmental safety review to ascertain whether and to what extent the construction poses a threat to health and safety of the students and the residents of the existing building;
  • the Department of Transportation to limit the staging area and other encroachments on the roadbed and sidewalks surrounding the construction site to ensure adequate safe passage for students and families to and from the school as well as for the residents going to and from the existing building;
  • the Department of Buildings to join our local elected officials, the Administrations and PTAs of the schools, the tenants association of the existing building, and CB7 to form a construction task force to facilitate dialogue on key issues and impacts of the construction and to ensure that all parties keep their respective commitments;
  • DoB to require the developer to provide meaningful mitigation to residents and the school population from the effects of noise, vibration, dust and debris from construction; and 
  • the DoB to withhold permission and issue stop work orders as necessary to ensure that no construction at 711 West End Avenue be permitted to go forward, nor any preparation work that would reasonably be expected to have the effects noted above, to proceed until the foregoing steps were completed.

Tuesday, July 28, 2015

Tenant Protection Plan "fails drastically": Independent engineer's report on 711 WEA development

The tenants at 711 W.E.A. have published a report from an independent engineer who reviewed Kalikow's permit application. The report is here (page 2 of the linked document.) It finds that the Tenant Protection Plan "fails drastically to account for both the size and complexity of the project, and ultimately falls short on every code requirement" the developer is required to address.

Developers used 4-week lapse in building code to win permits that would now be illegal

Tenants of 711 West End Ave. have issued a press release explaining how the developers managed to secure construction permits that are widely believed to be unsafe, and would now be illegal.

Current NYC building codes for tenant protection don't allow developers to claim they're constructing a "new, unoccupied building" on an occupied site unless they vacate and demolish the existing building. But Kalikow (the developers at 711 W.E.A.) have done just that. They submitted their applications during a short window of time when NYC building codes weren't in effect.

We don't know why the codes weren't in effect during that time, or how Kalikow knew they could build their huge project around that short time gap.

Read the press release here. The PDF includes an independent engineer's report, which finds that the developer's Tenant Protection Plan (required by DOB) is deeply inadequate. It also includes information from tenants' meeting with DOB Commissioner Rebholz.

Friday, June 26, 2015

Video: Protest of shady DOB permit approvals - June 25, 2015

NYC Councilmember Helen Rosenthal


P.S. 75 Parents & PTA


NYC Councilmember Helen Rosenthal

DNAinfo: Opponents of UWS Project Protest Last-Minute Construction Approval

"The tenants said they pooled funds and hired an engineer to evaluate the developer's Tenant Protection Plan, which typically outlines mitigation for factors like dust, noise and points of egress. The engineer found the plan inadequate, they claimed. 
"Tenants officially submitted a challenge to the developer's plan, but a DOB examiner already approved the safety plan Monday. Opponents still have until Aug. 2 to submit other challenges to the project. 
"Part of the problem is that not all of the developer's plans are publicly available, specifically the plan to excavate under the building, said tenant Terry Galo."

Read the article: http://www.dnainfo.com/new-york/20150626/upper-west-side/opponents-of-uws-project-protest-last-minute-construction-approval

Thursday, June 25, 2015

Photos from today's school/tenant protest

Photo credit: Gerson Romero











PS75 parents' statement at this morning's protest



Just two days ago, the Landmarks Preservation Commission voted to extend the West End Ave. historic district to cover our block and 711 West End Ave.
Designating the block as “historic” means that developers can’t just throw up a building – it means they have to acknowledge that there’s a community here, with a history and an integrity.
But the developers knew the vote was coming, so they slammed through a bunch of permits to avoid being accountable. The Department of Buildings issued permits on June 22 – the day before the LPC hearing – and apparently even on June 23. 
We already had concerns about tricks the developers were using. They’ve applied for a million little permits instead of transparently submitting their whole project. They tried to claim the building had no tenants! Now we know for sure they’re trying get around the accountability mechanisms that are supposed to protect the community.
But our questions are for DOB, and for the Mayor. What is DOB’s involvement with these developer tricks? After months of community efforts to work with DOB to address huge concerns, how did DOB just happen to approve the projects at the precise moment before the LPC’s vote? 

And to the Mayor: where are you? This community has written to you, emailed you, called for your help in the press. We have heard nothing from you.

DeBlasio is supposed to be the Mayor for affordable housing, and here’s a developer warehousing rent-stabilized apartments and dodging their responsibility to protect existing tenants. 

DeBlasio is supposed to the mayor for Vision Zero, and here’s a project that will bring heavy traffic dangers to kids at the deadly corner where he launched Vision Zero himself.

DeBlasio is supposed to be the mayor for education, but this amazing community school is about to be destroyed by years of construction noise and danger literally hanging over our kids’ heads. And when we call on the Mayor for help, we get silence.
We may just be public school parents and not real estate developers, but we are out here to demand answers and accountability. DOB issues construction permits that affect communities on every level, from affordability to safety to education – and they don’t have to coordinate with a single other agency. That doesn’t make any sense. Vision Zero convenes six agencies to collaborate just on street safety! But DOB doesn’t have to collaborate with any other agency, much less community, in deciding where it’s okay to launch massive multiyear construction.
We’re calling on the mayor to step in and make DOB accountable to standards set by other agencies – we need DEP, DOH, DOE, DOT, and HPD, and we need them now.
And we need the Mayor to look at these totally suspect construction permits issued to luxury developers at the 11th hour, and ask the hard questions about what kind of shady business is going on here between DOB and the developers.
Mr. Mayor, we are waiting for your answer.

Wednesday, June 24, 2015

UPDATED Thurs 6/25: Parents, tenants, electeds will protest planned construction

UPDATED: PRESS ADVISORY
Date: June 24, 2015

Contact: Emmaia Gelman (917) 517-3627, emmaia.gelman@gmail.com

UWS WILL RALLY TO OPPOSE LUXURY CONSTRUCTION THAT WOULD HOBBLE TWO PUBLIC SCHOOLS, SHRINK AFFORDABLE HOUSING

Parents demand answers on suspect DOB permit approval just the day before the Landmarks Preservation Commission vote that would have slowed development.

WHO:

Parents of P.S.75 & West Side Collaborative Middle School
Tenants of 711 West End Ave. and surrounding buildings
NYC Councilmember Helen Rosenthal
NYS Assemblymember Danny O’Donnell

WHAT:

RALLY to protest DOB’s suspect approval of permits construction at 711 West End Ave., and call for Mayor de Blasio to protect schools and communities against catastrophic effects of NYC’s luxury construction boom.

WHEN:

Thursday, June 25th, 8:10am
WHERE:

Rally: NW corner of West 95th Street and West End Ave.


BACKGROUND:
In the wake of DOB’s last-minute gimme to luxury developers, UWS community members call for the Mayor to engage DOB with city agencies responsible for the right to education, safety, environmental quality, and affordable housing.

Proposed experimental high-rise construction at 711 West End Ave. would overwhelm PS 75 and West Side Collaborative middle school, and exacerbate dangers at the deadly intersection where Mayor deBlasio launched Vision Zero. The construction as proposed will make it impossible for students to learn and create an exodus from the schools. Affordable housing is also threatened. Rent-stabilized apartments have been vacated and warehoused, and the disruption to surrounding buildings is expected to be shattering.

The Department of Buildings does not require developers to account for their impact on the community.

The community is calling on the Mayor to direct DEP, DOE, DOH, DOT, and HPD to engage with DOB to ensure safety, student rights, and tenant rights are addressed in permit applications. Such coordination is not unprecedented: Vision Zero requires most of the same agencies to collaborate on street safety. The city should implement Community Protection Plans for all such construction, parallel to the mandatory Tenant Protection Plan.

To date, the community’s requests for the Mayor’s help have gone unanswered.

###

http://dontdestroyUWS.blogspot.com

Breaking news from 711 W.E.A. tenants fighting construction

BREAKING NEWS!

 TAG Challenges Developer’s Tenant Protection Plan
On June 14 TAG filed the strongly worded report of our structural engineer with the Department of Buildings (“DOB”) to challenge the “Tenant Protection Plan” (TPP) submitted by developer Kalikow in support of its application for a permit to construct a ten-story luxury condominium atop 711 West End Avenue, our rent-stabilized, mid-1950’s combustible red brick building.  Note that 711, which has144 units, is nearly fully occupied.  While the DOB initially approved the TPP on May 29, 2015, under the New York City Building Code there is 15-day post-approval period within which to revoke the plan. Our submission of the engineer’s powerful report fell within that challenge period.

TAG also sent copies of the engineer’s detailed, five-page report to Council Member Helen Rosenthal and State Assembly Member Daniel O’Donnell, both strong supporters of TAG, as well as to a number of other elected officials.

Key Conclusions from Engineer Report
Under the New York City   Administrative Code a developer must file a tenant pro­tec­tion plan for any dwelling that will be occupied during on-site construction. Under the Code: "The elements of this plan… shall make detailed and specific provisions” for the safety and well being of the extant tenants. The TPP must address the issues of noise, dust, egress and fire.

The engineer wrote, “It is my finding that the Tenant Protection Plan submitted is very general, fails drastically to account for both the size and complexity of the pro­ject and ultimately falls far short on every code requirement cited above.” He found that the TPP neither makes any provision for the structural safety of the building nor for the tenants living in it.

What Next?
Based on the depth of the engineer’s report and its strong conclusions, our TAG attorneys sent an accompanying letter to DOB Commissioner Rick D. Chandler, with a copy to DOB Manhattan Borough Commissioner Martin Rebholz, to urge that they reject the Kalikow Tenant Protection Plan in its entirety.


TAG is now awaiting the DOB’s response.  In the meantime we continue to work with our attorneys, our engineer and Council Member Helen Rosenthal to secure any and all documents supporting any approved applications for the planned con­struction in order to continue to challenge the viability of this dangerous construction.